555 Mission
San Francisco, CA

This office tower uses a cable net wall system as well as point supported glass. The cable net walls were pre-tensioned to a load of 66,500 pounds to achieve a deflection limit of H/50. Significant communication with the Structural Engineer of Record was required due to the high cable loads inducing deformation in the main building.